The TGV (train à grande vitesse, French for "high-speed train") is France's high-speed rail service, developed by GEC-Alsthom (now Alstom) and SNCF, the French national rail operator, and operated primarily by SNCF. Following the inaugural TGV service between Paris and Lyon in 1981, the TGV network, centred on Paris, has expanded to connect cities across France and in adjacent countries. It holds the record for the fastest wheeled train, and the highest average speed for a regular passenger service.
The success of the first line led to a rapid expansion of the service, with new lines built to the south, west and northeast of the country. Eager to emulate in the success of the French network, neighbouring countries such as Belgium, Italy and Switzerland have built their own high-speed lines. TGVs link with Belgium, Germany and the Netherlands through the Thalys network, and Eurostar TGV derivatives with the United Kingdom. Several lines are planned, including extensions within France and to surrounding countries. Towns such as Tours have become a part of this "TGV commuter belt".
TGVs travel at up to 320 km/h (200 mph) in commercial use (over 500 km/h (310 mph) on test runs), which is made possible through the use of specially designed LGV (ligne à grande vitesse, high-speed line) lines without sharp curves, and a range of features that make TGVs suitable for high speed travel. These features include high-powered electric motors, low axle weight, articulated carriages and in-cab signalling, which removes the need for drivers to see lineside signals at high speed.
TGVs are manufactured primarily by Alstom, now often with the involvement of Bombardier. Except for a small series of TGVs used for postal freight between Paris and Lyon, TGV is primarily a passenger service. Trains derived from TGV designs operate in South Korea (KTX), Spain (AVE) and England (Eurostar).
Travel by TGV has largely replaced air travel between connected cities, due to shorter travel times (especially for trips taking less than three hours), reduced check-in, security and boarding formalities, and the convenient location of stations in the heart of cities. Furthermore, the TGV is a very safe mode of transport, with no recorded fatalities at high speed.
The idea of the TGV was first proposed in the 1960s, after Japan had begun construction of the Shinkansen in 1959. At the time the French government favoured new technologies, exploring the production of hovercraft and maglev trains such as Aérotrain. Simultaneously, SNCF began researching high-speed trains that would operate on conventional track.
It was originally planned that the TGV, then standing for très grande vitesse (very high speed) or turbine grande vitesse (high speed turbine), would be propelled by gas turbine-electric locomotives. Gas turbines were selected for their small size, good power-to-weight ratio, and ability to deliver a high power output over an extended period of time. The first prototype, TGV 001, was the only TGV constructed with this type of engine - following the sharp increase in the price of oil during the 1973 energy crisis, gas turbines were deemed impractical and the project turned to electricity from overhead lines. The electricity was to be generated by France's new nuclear power stations.
However, TGV 001 was not a wasted prototype. Its gas-turbine powerplant was only one of many technologies required for high-speed rail travel. It also tested high-speed brakes, which were needed to dissipate the large amount of kinetic energy amassed by a train operating at high speed, high-speed aerodynamics and signalling. It was articulated, meaning that its two carriages shared a bogie between them which allowed them to move freely with respect to one another. It reached 318 km/h (198 mph), which remains the world speed record for a non-electric train. Its interior and exterior were styled by British-born designer Jack Cooper, whose work formed the basis of all subsequent TGV design, including the distinctive nose shape of TGV power cars.
Changing the specification of the TGV to incorporate electric traction required a significant design overhaul. The first electric prototype, nicknamed Zébulon, was completed in 1974, testing features such as innovative body-mounting of motors, pantographs, suspension and braking. Body mounting of motors allowed over 3 tonnes (2.95 tons) to be dropped from the weight of the power cars. The prototype travelled almost 1 000 000 km (621,000 miles) during testing.
In 1976 the French government funded the TGV project, and construction of the LGV Sud-Est, the first high-speed line (ligne à grande vitesse), began shortly afterwards. The line was given the designation LN1, Ligne Nouvelle 1 (New Line 1).
After two pre-production trainsets had been rigorously tested and substantially modified, the first production version was delivered on 25 April 1980. The TGV service opened to the public between Paris and Lyon on 27 September, 1981. The initial target customers were businesspeople travelling between those two cities; as a mode of transport, the TGV was considerably faster than normal trains, cars, or airplanes. The trains soon became popular outside their initial target market; the public welcomed a fast and practical way to travel between cities.
Since then, further LGVs have opened in France, including the LGV Atlantique (LN2) to Tours/Le Mans (construction begun 1985, in operation 1989); the LGV Nord-Europe (LN3) to Calais and the Belgian border (construction begun 1989, in operation 1993); the LGV Rhône-Alpes (LN4), extending the LGV Sud-Est to Valence (construction begun 1990, in operation 1992); and the LGV Méditerranée (LN5) to Marseille (construction begun 1996, in operation 2001). The LGV Est from Paris to Strasbourg is under construction. High-speed lines based on LGV technology to connect with the French network have also been built in Belgium, the Netherlands and the United Kingdom.
The Eurostar service began operation in 1994, connecting continental Europe to London via the Channel Tunnel with trains derived from TGVs. The line used the LGV Nord-Europe in France from the outset. The first phase of the British high-speed line, the Channel Tunnel Rail Link, was completed in 2003. The project, built with SNCF engineering expertise, is due for completion in 2007, by which time London-Brussels will take only 2 hours and London-Paris only 2h15.
The TGV was not the world's first commercial high-speed service; the Japanese Shinkansen first connected Tokyo and Osaka on 1 October 1964, nearly 17 years before the first TGVs. The TGV does, however, hold the world speed record for conventional trains (Japan holds it for maglev trains); in 1990 it reached 515.3 km/h (320.2 mph) under test conditions with a shortened train (two power cars and three passenger cars). It remains the world's fastest conventional scheduled train as of 2005. More recently, a typical journey's average start-to-stop speed was 263.3 km/h (163.6 mph) Railway Gazette (November 1 2005), Railway Gazette International 2005 World Speed Survey Tables. Retrieved November 29 2005..
On 28 November 2003 the TGV carried its one-billionth passenger, second only to Shinkansen of Japan's 5 billion passengers, reached in 2000. The two-billion mark is expected to be reached in 2010.
The TGV runs on LGVs, allowing speeds of up to 320 km/h (200 mph) in normal operation on the newest lines. Originally, LGVs were defined as lines permitting speeds greater than 200 km/h (125 mph); this guideline was subsequently revised to permit speeds up to 250 km/h (155 mph). TGV trains also run on conventional track (lignes classiques), albeit at the normal maximum safe speed for those lines, up to a maximum of 220 km/h (137 mph). This is an advantage that the TGV has over, for example, magnetic levitation trains, as TGVs can serve many more destinations and can use city-centre stations (as in Paris, Lyon, and Dijon). They now serve around 200 destinations in France and abroad.
If used only for high-speed traffic, lines can incorporate steeper grades. This facilitates the planning of LGV routes and reduces the cost of line construction. The considerable momentum of TGV trains at high speed means that they can climb steep slopes without greatly increasing their energy consumption. They can also coast on downward slopes, further increasing efficiency. The Paris-Sud-Est LGV features line grades of up to 3.5%. (On the German high-speed line between Cologne and Frankfurt they reach 4%.)
Track alignment is more precise than on normal railway lines, and ballast is placed in a deeper than normal profile, resulting in increased load-bearing capacity and track stability. LGV track is anchored by more railway sleepers per kilometre than is usual, and all are made of concrete (either mono- or bi-blocs, the latter consisting of two separate blocks of concrete joined by a steel bar). Heavy rail (UIC 60) is used, and the rails themselves are more upright, 1/40 as opposed to 1/20 on normal lines. Use of continuous welded rails in place of shorter, jointed rails means that the ride is comfortable at high speeds, without the "clickety-clack" vibrations induced by rail joints.
The diameter of tunnels must be greater than normally required by the size of the trains travelling through them, especially at the entrances; this is to limit the effects of air pressure changes, which can be more problematic at the speeds reached by TGVs.
The steep gradients common on LGVs would limit the weight of slow freight trains. Slower trains would also mean that the maximum track cant (banking on curves) would be limited, so for the same maximum speed a mixed-traffic LGV would need to be built with curves of even larger radius. Such track would be much more expensive and difficult to build and maintain. Mixed-traffic LGVs remain uncommon, but certain stretches of less-used track are routinely mixed-traffic, such as the Tours branch of the LGV Atlantique, and the planned Nîmes/Montpellier branch of the LGV Mediterranée.
All LGV junctions are grade-separated, i.e. tracks crossing each other always use flyovers or tunnels in order to avoid the need to cross in front of other trains.
Because TGV trains travel too fast for their drivers to see and react to traditional lineside signals, an automated system called TVM (Transmission Voie-Machine, or track to train transmission) is used for signalling on LGVs. Information is transmitted to trains via electrical pulses sent through the rails, providing speed, target speed, and stop/go indications directly to the driver via dashboard-mounted instruments. This high degree of automation does not remove the train from driver control, though there are safeguards that can safely bring the train to a stop in the event of driver error.
The line is divided into signal blocks of about 1500 m (1 mile), the boundaries of which are marked by blue boards with a yellow triangle. Dashboard instruments show the maximum permitted speed for the train's current block, as well as a target speed based on the profile of the line ahead. The maximum permitted speed is based on factors such as the proximity of trains ahead (with steadily decreasing speeds permitted in blocks closer to the rear of the next train), junction placement, speed restrictions, the top speed of the train and distance from the end of the LGV. As trains cannot usually stop within one signal block (which ranges in length from a few hundred metres to a few kilometres), drivers are alerted to slow down gradually several blocks before a required stop.
Two versions of TVM signalling, TVM-430 and TVM-300, are in use on LGV. TVM-430, a newer system, was first installed on the LGV Nord to the Channel Tunnel and Belgium, and supplies trains with more information than TVM-300. Among other benefits, TVM-430 allows a train's on-board computer system to generate a continuous speed control curve in the event of an emergency brake activation, effectively forcing the driver to reduce speed safely without releasing the brake.
The signalling system is normally permissive: the driver of a train is permitted to proceed into an occupied block section without first obtaining authorization. Speed in this situation is limited to 30 km/h (19 mph; proceed with caution) and if speed exceeds 35 km/h (22 mph) the emergency brake is applied and the train stops. If the board marking the entrance to the block section is accompanied by a sign marked Nf, the block section is not permissive, and the driver must obtain authorisation from the Poste d'Aiguillage et de Régulation (PAR - Signalling and Control Centre) before entering. Once a route is set, or the PAR has provided authorization, a white lamp above the board is lit to inform the driver. The driver acknowledges the authorization using a button on the train's control panel. This disables the emergency braking which would otherwise occur when passing over the ground loop adjacent to the non-permissive board.
When trains enter or leave LGVs from lignes classiques, they pass over a ground loop that automatically switches the driver's dashboard indicators to the appropriate signalling system. For example, a train leaving the LGV for a ligne classique would have its TVM signalling system deactivated and its traditional KVB (Contrôle Vitesse par Balise, or beacon speed control) system enabled.
However, LGV route designers have tended to build new stations in suburban areas or in the open countryside several kilometers away from cities. This allows TGVs to stop without incurring too great a time penalty, since more time is spent on high-speed track. In some cases, stations have been built halfway between two communities. The station serving Montceau-les-Mines and Le Creusot is an example of this approach, and a more controversial example is Haute Picardie station, between Amiens and Saint-Quentin. The press and local authorities criticized Haute Picardie as being too far from either town to be convenient, and too far from connecting railway lines to be useful for travellers. The station was nicknamed la gare des betteraves, or 'beetroot station', as it is surrounded by beet fields.Le Point (issue 1682, December 9 2004), « Terre des sens » sur de nouveaux rails (in French). Retrieved November 24 2005. This nickname is now applied to similar stations located away from town and city centres, whether in the vicinity of beet fields or not.
A number of major new railway stations have been built to support the TGV service, some of which are major architectural achievements in their own right. Avignon TGV station, opened in 2001, has been praised as one of the most remarkable stations on the network, with a spectacular 340 m (1,115 ft)-long glazed roof that has been compared to that of a cathedral.The Sunday Times Online (29 May 2005), Party like a pope in Avignon. Retrieved 12 December 2005.Bulletin annuel de l'AFGC (issue 3, January 2001), Les gares nouvelles de Provence du TGV Méditerranée (in French), pp. 49–51.Guardian Unlimited (23 July 2001), Gee whizz! Jonathan Glancey takes in three stunning new TGV stations as he hurtles towards the Cote d'Azur at 200 mph. Retrieved December 13 2005.
TGV rolling stock differs from some other types in that trains consist of semi-permanently coupled multiple units. Bogies (Jacobs bogies) are located between carriages, supporting the carriages on either side, so that each carriage shares its bogies with the two adjacent to it. Power cars at each end of the trains have their own bogies.
This design is advantageous during a derailment, as the power car derails first and can move separately from the passenger carriages, which are more likely to stay upright and in line with the track. Normal trains, by contrast, may split at couplings and jack-knife.
A disadvantage of this carriage design is that it is difficult to split sets of carriages. While TGV power cars can be removed from trains via standard uncoupling procedures, specialized depot equipment is needed to split carriages by lifting the entire train at once. Once uncoupled, one of the carriage ends is left without a bogie at the split, so a bogie frame is required to hold it up.
SNCF operates a fleet of about 400 TGVs. Six types of TGV or TGV derivative currently operate on the French network; these are TGV Sud-Est (passenger and La Poste varieties), TGV Atlantique, TGV Réseau/Thalys PBA, Eurostar, TGV Duplex and Thalys PBKA. A seventh type, TGV POS (Paris-Ostfrankreich-Suddeutschland, or Paris-Eastern France-Southern Germany), is currently being tested.
All TGVs are at least bi-current, which means that they can operate at 25 kV, 50 Hz AC on newer lines (including LGVs) and at 1.5 kV DC on older lines (such as the 1.5 kV lignes classiques that are common around Paris). Trains crossing the border into Germany, Switzerland, Belgium, the Netherlands and the United Kingdom must accommodate foreign voltages. This has led to the construction of tri-current and quadri-current TGVs. All TGVs are equipped with two pairs of pantographs, two for AC use and two for DC use. When passing between areas of different supply voltage, marker boards remind the driver to turn off power to the traction motors, lower the pantograph(s), adjust a switch on the dashboard to select the appropriate system, and raise the pantograph(s). Pantographs and pantograph height control are selected automatically based on the voltage system chosen by the driver. Once the train detects the correct supply to its transformers, a dashboard indicator lights up and the driver can switch on power to the traction motors. The train coasts across the boundary between voltage sections.
| Equipment type | Top speed | Seating capacity | Overall length | Width | Weight | Power output (under 25 kV) |
|---|---|---|---|---|---|---|
| TGV Sud-Est | 270 km/h (168 mph) as built 300 km/h (186 mph) rebuilt | 345 | 200.2 m (657 ft) | 2.81 m (9.2 ft) | 385 tonnes (424 tons) | 6,450 kW |
| TGV Atlantique | 300 km/h (186 mph) | 485 | 237.5 m (780 ft) | 2.90 m (9.5 ft) | 444 tonnes (489 tons) | 8,800 kW |
| TGV Réseau | 300 km/h (186 mph) | 377 | 200 m (656 ft) | 2.90 m (9.5 ft) | 383 tonnes (422 tons) | 8,800 kW |
| Eurostar Three Capitals | 300 km/h (186 mph) | 794 | 393.7 m (1,293 ft) | 2.81 m (9.2 ft) | 752 tonnes (829 tons) | 12,240 kW |
| Eurostar North of London | 300 km/h (186 mph) | 596 | 318.9 m (1,033 ft) | 2.81 m (9.2 ft) | 665 tonnes (733 tons) | 12,240 kW |
| TGV Duplex | 320 km/h (199 mph) | 512 | 200 m (656 ft) | 2.90 m (9.5 ft) | 386 tonnes (425 tons) | 8,800 kW |
| Thalys PBKA | 300 km/h (186 mph) | 377 | 200 m (656 ft) | 2.90 m (9.5 ft) | 385 tonnes (424 tons) | 8,800 kW |
| TGV POS | 320 km/h (199 mph) | 200 m (656 ft) | 2.90 m (9.5 ft) | 423 tonnes (466 tons) | 9,600 kW |
The Sud-Est fleet was built between 1978 and 1988 and operated the first TGV service, from Paris to Lyon in 1981. Currently there are 107 passenger sets operating, of which nine are tri-current (including 15 kV, 16 2/3 Hz AC for use in Switzerland) and the rest bi-current. There are also seven bi-current half-sets without seats that carry mail for La Poste between Paris and Lyon; these are in a distinctive yellow livery.
Each set is made up of two power cars and eight carriages (capacity 345 seats), including a powered bogie in each of the carriages adjacent to the power cars. They are 200 m (656 ft) long and 2.81 m (9.2 ft) wide. They weigh 385 tonnes (424 short tons; 379 long tons) with a power output of 6,450 kW under 25 kV.
Originally the sets were built to run at 270 km/h (168 mph) but most were upgraded to 300 km/h (186 mph) during their mid-life refurbishment in preparation for the opening of the LGV Méditerranée. The few sets that still have a maximum speed of 270 km/h operate on those routes that include a comparatively short distance on LGV, such as those to Switzerland via Dijon. SNCF did not consider it financially worthwhile to upgrade their speed for a marginal reduction in journey time.
The Atlantique fleet was built between 1988 and 1992. 105 bi-current sets were built for the opening of the LGV Atlantique and entry into service began in 1989. They are 237.5 m (780 ft) long and 2.9 m (9.5 ft) wide. They weigh 444 tonnes (489 tons), and are made up of two power cars and ten carriages with a capacity of 485 seats. They were built from the outset with a maximum speed of 300 km/h (186 mph) with 8,800 kW total power under 25 kV.
Modified unit 325 set the world speed record in 1990 on the new LGV before its opening. Various modifications, such as improved aerodynamics, larger wheels and improved braking were made to enable test run speeds of over 500 km/h (310 mph). The set was reduced to two power cars and three carriages to improve the power-to-weight ratio, weighing 250 tonnes (275 tons). Three carriages, including the bar carriage in the centre, is the minimum possible configuration because of the way the sets are articulated.
The first Réseau ("Network") sets entered service in 1993. Fifty bi-current sets were ordered in 1990, supplemented by an order for 40 tri-current sets in 1992/1993. Ten of the tri-current sets carry the Thalys livery and are known as Thalys PBA (Paris-Brussels-Amsterdam) sets. As well as using standard French voltages, the tri-current sets can operate under the Low Countries' and Italian 3kV DC supplies.
They are formed of two power cars (8,800 kW under 25 kV - as TGV Atlantique) and eight carriages, giving a capacity of 377 seats. They have a top speed of 300 km/h. They are 200 m (656 ft) long and are 2.90 m (9.5 ft) wide. The bi-current sets weigh 383 tonnes (422 tons), and owing to axle-load restrictions in Belgium the tri-current sets have a series of modifications, such as the replacement of steel with aluminium and hollow axles, to reduce the weight to under 17 tonnes (18.7 tons) per axle.
Owing to early complaints of uncomfortable pressure changes when entering tunnels at high speed on the LGV Atlantique, the Réseau sets are now pressure-sealed.
The Eurostar train is essentially a long TGV, modified for use in the United Kingdom and in the Channel Tunnel. Differences include the smaller cross-section, to fit within the constrictive British loading gauge; British-designed asynchronous traction motors; and extensive fireproofing in case of fire in the tunnel.
In the UK, it is known under the TOPS classification system as class 373. In the planning stages, it was also known as the TransManche Super Train (Cross-channel Super Train). The trains were built by GEC-Alsthom (now Alstom) in La Rochelle (France), Belfort (France) and Washwood Heath (England), entering service in 1993.
Two types were built: the Three Capitals sets, consisting of two power cars and 18 carriages, including two with one powered bogie each, and the North of London sets, consisting of two power cars and 14 carriages, again with two with one powered bogie each. Full sets of both types consist of two identical half-sets which are not articulated in the middle, so that in case of emergency in the Channel Tunnel one half can be uncoupled and leave the tunnel. Each half-set is numbered separately.
Thirty-eight full sets, plus one spare power car, were ordered by the railway companies involved: 16 by SNCF, four by NMBS/SNCB, and 18 by British Rail, of which seven were North of London sets. Upon privatisation of British Rail by the UK Government, the BR sets were bought by London and Continental Railways, whose subsidiary Eurostar (U.K.) Ltd. is managed by a consortium of the National Express Group (40%), SNCF (35%), SNCB (15%) and British Airways (10%).
The Three Capitals sets operate at a maximum speed of 300 km/h (186 mph), with the power cars supplying 12,240 kW of power. They are 394 m (1,293 ft) long and have a capacity of 766 seats, weighing a total of 752 tonnes (829 short tons; 740 long tons). The North of London sets have a capacity of 558 seats. All of the trains are at least tri-current and are able to operate on 25 kV, 50 Hz AC (on LGVs, including the Channel Tunnel Rail Link, and on UK overhead electrified lines), 3 kV DC (on lignes classiques in Belgium) and 750 V DC (on the UK former Southern Region third rail network). The third-rail system will become superfluous in 2007 when the second phase of the Channel Tunnel Rail Link is completed between London and the Channel Tunnel, as it uses 25 kV, 50 Hz AC exclusively. Five of the Three Capitals sets owned by SNCF are quadri-current and are able to operate on French lignes classiques at 1500 V DC.
Three of the Three Capitals sets owned by SNCF are in French domestic use and carry the silver and blue TGV livery. The North of London sets have never seen international use, but were intended to provide direct services from continental Europe to UK cities north of London, using the West Coast Main Line and the East Coast Main Line. These never came to fruition because budget airlines in the UK offered lower fares. A few of the sets were leased to GNER for use on its White Rose service between London and Leeds, with two of them carrying GNER's dark blue livery. The lease ended in December 2005. RAIL (pages 14-15, issue 527, November 23 2005 - December 6 2005), Class 91s to replace GNER's Eurostars
The current Chief Executive of Eurostar, Richard Brown, has suggested that the trains could be replaced by double-decker trains similar to the TGV Duplex when they are withdrawn. A double-deck fleet could carry 40 million passengers per year from England to Continental Europe, equivalent to adding an extra runway at a London airport. RAIL (page 11, issue 529, December 21 2005 - January 3 2006), Double decked trains could be replacement for Eurostars
The Duplex was built to increase TGV capacity without increasing train length or the number of trains. Each carriage has two levels, with access doors at the lower level taking advantage of low French platforms. A staircase provides access to the upper level, where the gangway between carriages is located. This layout provides a capacity of 512 seats per set. On busy routes such as Paris-Marseille they are operated in pairs, providing 1,024 seats in a single train. Each set also has a wheelchair-accessible compartment.
After a lengthy development process starting in 1988 (during which they were known as the TGV-2N), they were built in two batches: 30 between 1995 and 1998, then a further 34 between 2000 and 2004. They weigh 386 tonnes (425 short tons; 379 long tons) and are 200 m (656 ft) long, made up of two power cars and eight bi-level carriages. Extensive use of aluminium means that they weigh not much more than the TGV Réseau sets they supplement. The bi-current power cars provide a total power of 8,800 kW, and they have a slightly increased speed over their predecessors of 320 km/h (199 mph).
Unlike Thalys PBA sets, the PBKA (Paris-Brussels-Köln (Cologne)-Amsterdam) sets were built exclusively for the Thalys service. They are technologically similar to TGV Duplex sets, but do not feature bi-level carriages. All of the trains are quadri-current, operating under 25 kV, 50 Hz AC (LGVs), 15 kV 16.7 Hz AC (Germany, Switzerland), 3 kV DC (Belgium) and 1,5 kV DC (the Netherlands and French lignes classiques). Their top speed in service is 300 km/h (186 mph) under 25 kV, with two power cars supplying 8,800 kW. When operating under 15 kV power output drops to 4,460 kW, resulting in a very poor power-to-weight-ratio on German high-speed lines. They have eight carriages and are 200 m (656 ft) long, weighing a total of 385 tonnes (424 short tons; 379 long tons). They have a capacity of 377 seats.
Seventeen trains were ordered: nine by SNCB, six by SNCF and two by NS. Deutsche Bahn contributed to financing two of the SNCB sets.
POS trains, standing for Paris-Ostfrankreich-Süddeutschland (Paris-Eastern France-Southern Germany) are under test for use on the LGV Est, currently under construction.
The trains will consist of two power cars with eight TGV Réseau type carriages, with a total power output of 9,600 kW and a top speed of 320 km/h (199 mph). Unlike TGV-A, TGV-R and TGV-D, it has asynchronous motors and, in case of failure, isolation of an individual motor in a powered bogie is possible. They will weigh 423 tonnes (466 short tons; 416 long tons).
Amsterdam and Cologne are already served by Thalys TGVs running on ordinary track, though these connections are being upgraded to high-speed rail. London is served by Eurostar trains running at high speeds via the partially-completed Channel Tunnel Rail Link and then at normal speeds along regular tracks through the London suburbs, although Eurostar will use a fully-segregated line once Section 2 of the link is complete in 2007.
In the short term, plans are being considered to increase the capacity of TGVs by 10% by replacing the central two power cars of a double TGV with passenger carriages. These carriages would have motorised bogies underneath them, as would the first and last carriage of the train, to make up for the lost power. *
One area being explored is magnetic levitation. This is, however, on hold as the cost of implementing maglev technology is too high. An entirely new network would be required, as maglev trains require track designed specifically for their use, and unless significant demolition or tunnelling took place in city centres, the new system would only be able to reach the outside of towns and cities.
In more than two decades of high-speed operation, the TGV has not recorded a single fatality due to accident while running at high speed. There have been several accidents, including three derailments at or above 270 km/h (168 mph), but in none of these did any carriages overturn. This is credited in part to the stiffness that the articulated design lends to the train. There have, however, been fatal accidents involving TGVs on lignes classiques, where the trains are exposed to the same dangers as normal trains, such as level crossings.
Following the number of accidents at level crossings, an effort has been made to remove all level crossings on lignes classiques used by TGVs. The ligne classique from Tours to Bordeaux at the end of the LGV Atlantique has no level crossings as a result.
Lyon Turin Ferroviaire (Lyon-Chambéry-Turin), which would connect the TGV to the Italian TAV network, has been the subject of demonstrations in Italy. While most Italian political parties agree on the construction of this line, inhabitants of the towns where construction would take place are vehemently opposing it. The concerns of the protesters centre around storing dangerous materials mined from mountain, like asbestos and uranium, in the open air. This serious health danger could be avoided by using more appropriate but expensive techniques for handling radioactive materials. A six-month delay in the start of construction has been decided in order to study solutions, but a ten-year-old NIMBY national movement against the TAV is trying to exploit inhabitants' legitimate worries to criticize the development of high-speed rail in Italy as a whole.Planet Ark (reprinted from Reuters November 1 2005), Environmental Protesters Block French-Italian Railway. Retrieved November 1 2005.
General complaints about the noise of TGVs passing near towns and villages have led the SNCF to build acoustic fencing along large sections of LGVs to reduce the disturbance to residents, but protests still take place where SNCF has not addressed the issue. Environmental Science and Engineering (November 2001), Train à grande vitesse causes distress. Retrieved November 24 2005.
High-speed rail | High-speed trains | Rail transport in France | SNCF | TGV | Transport in Europe | Eurostar
TGV | TGV | T.G.V. | TGV | TGV | Train à Grande Vitesse | ت ژ و | TGV (train à grande vitesse) | TGV | TGV | TGV | Train à Grande Vitesse | TGV | TGV | TGV | TGV | TGV | TGV | TGV | TGV | TGV | TGV | 法国高速列车